Deep coal rock gas electric drive fracturing construction of Honghua Group

Recently, the "China's first deep coal rock gas electric drive fracturing platform" Jishen 11-7A platform, participated by Honghua Electric

Start of the first round of fracturing in the Huoshaoshan operation area of Zhundong Oil Production Plant

On March 9th, at the H2340 well fracturing site of Zhundong Oil Production Plant, there was a bustling scene of heavy work and rapid progress

Daqing Oilfield independently develops variable card spacing fracturing technology

As of March 6th, Daqing Oilfield has independently developed a ball activated variable card spacing fracturing technology

Tech CNPC PetroChina 2024-03-11

Continuous sand fracturing technology successfully tested in Daqing oilfield

In early March, the GY21-Q9-H4 well constructed by Bohai Drilling Downhole Technical Service Branch successfully completed the 9th and 10th stages of fracturing construction using continuous sand fracturing technology

Tech 2024-03-07

Significant Breakthrough in Intelligent Fracturing Technology for Xinjiang Oilfield

Recently, the intelligent research and development team of the Engineering Technology Research Institute (Supervision Company) of Xinjiang Oilfield Company conducted independent testing using shale oil horizontal well fracturing data

Tech CNPC PetroChina 2024-01-26

Sinopec's highest sand fracturing construction displacement record

Recently, Southwest Petroleum Engineering Company's Underground Operations Branch completed the sand fracturing construction of Section 12 of Fulu 2 well with safety, quality, and efficiency.

Sinopec 2024-01-21

Sinopec's record for the highest number of fractured sections in shale gas wells

Recently, Jiaoye 18-S12 well, which was constructed by Jianghan Petroleum Engineering Downhole Testing Company, successfully completed 57 sections of fracturing construction

Shale Gas Sinopec 2024-01-16

The World's First Set of 175 Megapascals Fracturing Equipment Application

On January 10th, the world's first set of 175 megapascals fracturing equipment was successfully applied in the key exploration well Qiyeshen 1 of Sinopec Exploration Company

Tech Sinopec 2024-01-12

Daqing Gulong Shale Oil Fracturing Has Once Again Broken Multiple Records

Recently, the Gulong Shale Oil Demonstration Zone in Daqing Oilfield reported another success

Jianghan Petroleum Engineering Drilling and Fracturing Indicators Set a 5-Year High Record

According to reports, Jianghan Petroleum Engineering Company completed drilling footage of 975000 meters and 3600 layers in two main specialties, drilling and fracturing, while reducing its workforce, both setting records for the highest indicators in nearly 5 years.

Sinopec 2024-01-08

Daqing Oilfield "Nano Scissors" Technology Assists Oil Displacement

Nanotechnology, as an emerging industry, is "emerging" in the field of petroleum industry technology and has become a new direction for Daqing oil professionals to explore.

2023-11-19

Sinopec Shengli Oilfield Has Recently Released 10 Major Landmark Achievements

Sinopec Shengli Oilfield Has Recently Released 10 Major Landmark Achievements

2023-11-14

The Highest Daily Production Shale Gas Well in Jilin Oilfield Since Its Entry into Sichuan was Born

The Highest Daily Production Shale Gas Well in Jilin Oilfield Since Its Entry into Sichuan was Born

Call for Speakers & Papers: Energy China Forum 2022-Hydraulic Fracturing Technology Sub-Forum

Call for Speakers and Papers: Energy China Forum 2022-Hydraulic Fracturing Technology Sub-Forum

Call for Speakers & Papers: ECF2022-12th Asia-Pacific Shale & Unconventional Resources Summit

Call for Speakers & Papers! Energy China Forum 2022 -12th Asia-Pacific Shale & Unconventional Resources Summit will be held on Oct 19-21, 2022 in Shanghai China.

China’s Jereh Oilfield Gains as Unit Wins First Oil, Gas Development Contract in Kuwait

Shares in Yantai Jereh Oilfield Services Group advanced as much as 5 percent today after the private Chinese oil field services developer said that a subsidiary has won the firm’s first oil and gas development contract in the oil-rich kingdom of Kuwait.Jereh Oilfield’s share price [SHE:002353] closed 2.21 percent higher at CNY43 (USD6.70). Earlier in the day it had reached CNY44.28.Unit Jereh Oil & Gas Engineering has been chosen as general contractor for Kuwait Oil’s Jurassic Production Facility 5 Project, responsible for engineering, procurement and construction, the Yantai, northeastern Sha

Energy China Forum 2020 Recruitment Notification - International Project Officer

Energy China Forum 2020 Recruitment Notification - International Project Officer, Shanghai ChinaEnergy China ForumDowntown, Huangpu District, Shanghai, ChinaFull-timeResponsibility:1. Responsible for international project promotion, including planning, publicity and copywriting;2. Organize or provide assistance to international industry summit, global conferences and other events;3. Responsible for daily communication, marketing, maintenance and following up with global energy institute, governments, associations and energy companies;4. Responsible for market research, including industry dynam

Major oil, gas platform to be shipped to South China Sea

"Dongfang 13-2 CEPB," the second largest offshore oil production and processing platform in China, was completed for shipment at the Gaolan Port in the city of Zhuhai in south China's Guangdong Province earlier this month and will be shipped to the Yinggehai Basin of the South China Sea Wednesday.The "Dongfang 13-2 CEPB" platform built by Zhuhai COOEC (China's Offshore Oil Engineering Company)-Fluor Heavy Industries Co. Ltd. is a comprehensive oil and gas processing platform.The floating weight of the platform is 17,247 tonnes, equivalent to the weight of 10,000 ordinary cars, and cover

CNOOC 2019-04-09

China to Create National Oil, Gas Pipeline Co.

China said it will form a national oil and pipeline company, the first public acknowledgment of the massive energy industry overhaul planned since at least 2014.The creation of the pipeline company was mentioned in the National Development & Reform Commission’s work report released Tuesday during the annual National People’s Congress meeting, alongside closely watched indicators including economic growth targets and debt reduction goals, Bloomberg reported.President Xi Jinping’s government has planned for years to spin off into a new company some of the 112,000 km of oil, gas and fuel pipeline

Energy Reform 2019-03-08

China to form national oil and gas pipeline company-state planner

China will create a national oil and gas pipeline company, the country’s state planner said on Tuesday in the first official acknowledgement of a reform that has been anticipated by the energy industry.The National Development and Reform Commission (NDRC) did not give a timetable or any details of the plan in its annual work report published at the opening of the annual meeting of parliament.Creating a central oil and gas operator will help China’s state-owned energy companies separate the cost of pipeline transportation from the sale of oil and gas.Reuters reported last month that a formal pl

China Oil Pipeline 2019-03-05
Top
Message

Please leave your comment

Name*
Tel*
Email*
Company*
Message*
提交