ECF2019 Award for Stimulation & EOR Tech

Project:Temporary Blocking Agent and Chemical Packer

Company:Beijing Gepetto Oil Technology Co. Ltd.

Awarded: Stimulation & EOR Technology

Project Full Name: Fully Dissoluble-High Strength Temporary Blocking Agent and Chemical Packer

Standard: International advanced level


The project has developed a series of temporary plugging agents and chemical packers for the segmental volume fracturing of shale gas horizontal wells, which has improved the reservoir volume and development effect. In the field of low-permeability oil and gas reservoirs such as tight oil and gas, shale gas, this technology is an important accessory product for improving single well production, dense cutting, high sand volume, temporary plugging volume fracturing technology, etc., which can greatly increase the fracturing volume and form a complex Cracks. The effect of increasing production is obvious. A unified breakthrough in temporary high-intensity and solubility has been promoted in some large oil fields in China, and the effect has been confirmed by the actual application on site, which has a good application prospect. Recommendation: Cost control and further clarification of the scope of application of this technology are key to positioning the future value of the technology.


1571627839763034090.jpg

Disclaimer: The above content was edited by Energy China Forum (www.energychinaforum.com), please contact ECF before reproduce.
Top
Message

Please leave your comment

Name*
Tel*
Email*
Company*
Message*
提交