Liaoyang Petrochemical Company Maximizes Steam Efficiency

2022-01-18 Viewed:875

Source:CNPC News

Liaoyang Petrochemical set up an optimization team to continuously find the invalid heat tracing range and reduce the invalid output on the basis of shutting down the 8310m heat tracing pipeline. Professional technicians have formulated the temperature, room temperature and water supply temperature curves to ensure that the heating temperature is controlled within a reasonable range.

In order to reduce heat loss and improve steam supply quality, the optimization team continued to carry out special rectification of thermal insulation. A total of 5880m pipeline insulation was replaced in the first half of this year. Under the summer operation mode, close 210 steam traps operating in winter and shut down about 1500m steam pipeline. By strengthening patrol inspection, 4.1t/h steam is saved.


Energy China Forum is the biggest and most popular platform for shale & unconventional resources in China. Besides website, we also run a WeChat Account, which has the most followers in this area. We would love to help you to expand your market to China.

For more infromtaion about us, please check http://en.energychinaforum.com/about/ads 

If you are interested, don't hesitate to contact us at ecfchina1@gmail.com or ecf@energychinaforum.com


Disclaimer: The above content was edited by Energy China Forum (www.energychinaforum.com), please contact ECF before reproduce.

Author:    News Time:2022-01-18

Back
Top
Message

Please leave your comment

Name*
Tel*
Email*
Company*
Message*
提交